Customer stories · In depth

Project profitability in Power BI with Fortnox and SevenTime

How does the finance team know that project results in Power BI reconcile with the accounting records? A company providing outdoor maintenance services needed to track posted revenue and costs alongside work orders and time for each project.

How we connected operations and finance

Kugghuset brought accounting data from Fortnox and work orders and time from SevenTime together in a data warehouse. Power BI then retrieved data for project analysis, customer analysis and the income statement. The finance team could track project results alongside the work performed.

Fortnox
Posted revenue and costs
SevenTime
Work orders and reported time
Power BI
Project analysis from the data warehouse

Three reconciliations using synthetic figures

Project P-101 is fictitious. The amounts, counts and times below are example data showing how the checks work.

1. Did the data arrive from the source systems?

Compare the identifiers for the same project and period in the source systems and the data warehouse. In the example, journal entry V-042 is missing after the first import from Fortnox. All work orders and time entries from SevenTime have arrived.

Records in the source systems and data warehouse
DatasetSourceWarehouse beforeWarehouse after
Journal entries in Fortnox 424142
Work orders in SevenTime 121212
Time entries in SevenTime 181818

Once the missing journal entry has been imported, the identifiers in the example match. A successful job and matching row counts are useful signals. Comparing identifiers shows which records actually arrived.

2. Do the project amounts reconcile with Fortnox?

Reconcile the revenue and cost accounts against an accounting extract from Fortnox for the same company, project and accounting period. In the example, V-042 contains a materials cost of SEK 3 500. The missing amount made the project result appear SEK 3 500 better.

Posted amounts for project P-101 in April, SEK excluding VAT
ItemFortnoxWarehouse beforeWarehouse after
Revenue 125 000125 000125 000
Materials and purchases 28 50025 00028 500
Other costs 49 50049 50049 500
Project result 47 00050 50047 000

The project result here is posted revenue minus posted costs. The 186 hours reported in SevenTime are displayed as a separate measure.

3. Did Power BI read the new reporting data?

The Power BI refresh at 08.00 succeeded and read the data prepared at 07.00. The data warehouse did not build the corrected data until 08.20. Compare the version actually held in the model and trace an amount all the way to the report.

The data warehouse’s corrected dataset and the two Power BI refreshes
CheckData warehouseBI 08.00BI 08.30
Dataset built 08.2007.0008.20
Journal entries 424142
Project result SEK 47 000SEK 50 500SEK 47 000

At the next refresh at 08.30, the model shows the correct version, the correct number of journal entries and a project result of SEK 47 000. The check applies to the version and project result that were compared.

What could be verified in the client project

  • The company used the project analysis in its performance reviews.
  • In a documented reconciliation, all reviewed income statement accounts matched the Fortnox accounting records to the öre.
  • A separate check showed matching row counts in Power BI and the data warehouse for all reviewed reporting tables.

Want to track results by project?

Tell us where you record revenue and costs and where you report time. We will review how the data can be connected and which reconciliations you need.